AK Green Solutions delivers end-to-end turnkey EV charging stations powered by Tata Power EZ Charge. We handle everything from site feasibility audits and 100% DISCOM liaisoning to precision civil execution and 24/7 automated monetization.
EV infrastructure demands continuous operational uptime. AK Green Solutions brings the century-long engineering trust of Tata Power directly to your parking facility.
Unbranded third-party EV stations frequently suffer from uncertified power modules, grid tripping, delayed utility approvals, and separate app interfaces that create friction for electric vehicle drivers.
As an Authorized Channel Partner, AK Green Solutions supplies ARAI-certified Tata Power EZ Charge pedestals integrated with the national network, automated revenue deposits, and a 4-hour on-site maintenance guarantee.
Scroll down to inspect the internal architecture of the flagship Tata Power EZ Charge 60 kW DC Fast Pedestal—from high-voltage grid intake to automated cloud monetization.
Power enters through heavy-duty fire-retardant armored cables into dedicated Class-I+II surge arrestors and dual-pole MCCBs. Independent chemical earthing pits (< 1.5Ω) guarantee voltage spikes from the regional grid never bleed into building circuits or domestic elevators.
High-frequency Silicon Carbide (SiC) power electronics convert AC to DC with industry-leading 96.2% peak efficiency. IP55 dual-chamber forced-air cooling isolates dust, monsoon moisture, and extreme 50°C Indian summer ambient heat from high-voltage components.
Twin 200A CCS-2 guns deliver flexible charging. When a single EV plugs in, it receives the full 60 kW burst (10% to 80% in 45 min). When a second vehicle connects, intelligent load division splits power into 30 kW + 30 kW without tripping the building transformer.
EV drivers authenticate in 2 seconds via RFID card or the Tata Power EZ Charge mobile app (UPI, Cards, Net Banking). Charging telemetry syncs over encrypted 4G/Ethernet directly with the national cloud, depositing monthly revenue settlements directly into your bank account.
Explore the official Tata Power EZ Charge hardware range. Switch between models to view real product photography, engineering blueprints, and electrical specifications.
The Flagship Urban Workhorse for Commercial Fleets & Retail Hubs
AK Green Solutions takes full accountability for electrical, civil, and regulatory milestones. You provide the parking footprint; we deliver an operational charging amenity.
Physical site audit, parking traffic analysis, transformer capacity check, and state DISCOM sanctioned load verification.
Reinforced concrete mounting plinth construction, armored HT/LT copper cabling, dedicated earthing pits, and crash bollards.
Mounting OEM Tata Power hardware, integrating surge protection devices (SPD), Type B RCD, and electrical isolation breakers.
Industrial 4G SIM provisioning, encrypted OCPP 1.6J handshake with the Tata Power National Cloud, and RFID provisioning.
End-to-end safety sign-off, instant listing on the Tata Power EZ Charge App for millions of EV drivers, and automated payout activation.
Real-time visibility over power draw, dynamic load balancing (peak shaving), remote session control, and automated billing realization.
Real-time kW load monitoring with automated peak demand shaving
Whether you manage a residential society, an IT corporate park, a commercial fleet yard, or a highway transit plaza, we configure the exact capacity mix.
End-to-end community EV charging with zero society maintenance headache. Residents charge seamlessly using the Tata Power EZ Charge mobile app or RFID cards with automated billing.
Elevate corporate ESG credentials, earn LEED & IGBC Green Building rating credits, and provide top-tier EV amenities to employees, corporate tenants, and campus visitors.
Engineered for high-throughput commercial e-commerce fleets, taxi aggregators, and delivery 3-wheelers/4-wheelers needing rapid turnaround and overnight scheduling.
Transform high-traffic transit corridors, highway restaurants, and retail destinations into high-margin EV supercharging destinations with guaranteed dwell-time revenue.
Model your EV charging venture in real time. Adjust hardware configurations, unit count, daily operating hours, and consumer tariff to project monthly revenues, margins, and payback periods.
A century-long heritage of nation-building combined with responsive, certified engineers dedicated to your turnkey site execution.
Direct factory warranty backed by Tata Power with certified replacement modules and regional spare parts warehouses.
Rapid-response certified technician teams stationed across major metro clusters to guarantee 99.8% uptime.
Complete paperwork execution for state DISCOM power sanction, dedicated EV sub-meters, and government capital subsidies.
Direct monthly revenue settlements deposited into your account with GST compliance, audit analytics, and tamper-proof metering.
Everything RWAs, commercial facility directors, and fleet managers need to know about turnkey Tata Power EV charging infrastructure.
AK Green Solutions provides two flexible commercial structures tailored to your property:
We manage 100% of the end-to-end liaisoning with your regional electricity distribution company (BSES, Tata Power-DDL, MSEDCL, BESCOM, UPPCL, TANGEDCO, etc.). We apply for dedicated state-subsidized EV tariffs and independent LT sub-metering, ensuring zero impact on your existing sanctioned domestic load.
EV drivers simply plug in and pay via the nationwide Tata Power EZ Charge mobile app (supporting UPI, Credit/Debit cards, Net Banking, and RFID tap cards). As the estate administrator, your society can define multi-tier tariffs—e.g. resident-subsidized charging vs public visitor rates.
Our complete scope of work includes civil foundation pedestals, heavy-duty underground trenching with PVC/GI conduits, fire-retardant armoured copper/aluminum cabling, dedicated dual-pole MCB/RCCB distribution boards, chemical earthing pits (< 2Ω), surge protection devices (SPD), fire extinguishers, and anti-crash safety bollards.
The Tata Power Cloud CMS continuously tracks main transformer load. During evening domestic peak hours (7 PM – 11 PM), chargers dynamically balance output to prevent tripping, resuming full fast-charging speed as domestic consumption drops.
All hardware is covered by a 3-Year Tata Power OEM factory warranty. AK Green Solutions provides a 4-hour on-site maintenance SLA across major metro clusters, with regional warehouses maintaining certified replacement components and 24/7 cloud diagnostics.